Digital Waste Tracking for Receiving Sites: WasteLinks Now Submits Your Waste Receipts to DEFRA
From 1 October 2026, permitted sites must report every load received to DEFRA within two working days. WasteLinks now handles the whole submission for you.
WasteLinks began as a marketplace connecting customers with licensed waste carriers. Today we are opening a second front door, because the biggest compliance change in a generation is about to land on the people who receive waste rather than the people who move it. From today, recycling yards, transfer stations and treatment facilities can use WasteLinks to report every load they receive straight to DEFRA's Digital Waste Tracking Service. You can register your site now, and it costs nothing until the rules go live.
Why we built this now
The honest answer is that the industry told us to. Over the past weeks our LinkedIn feed has filled up with receiving sites and waste consultants working through what digital waste tracking actually demands of them. We watched a hazardous waste consultant take DEFRA's spreadsheet template apart tab by tab and conclude that the free route is anything but easy. We watched the managing director of a metal recycling firm ask, quite reasonably, how her data is supposed to reach DEFRA at all if her software supplier is not on the list of approved providers, and collect a dozen sales pitches but no straight answer. The same questions kept surfacing in every thread: what does the two working day rule really mean, what happens if my current system is not ready, and why does the supposedly simple option need a manual just to fill in.
We were reading those conversations from an unusual position. WasteLinks had already built its Digital Waste Tracking connection for the carriers we serve, and that connection had already passed DEFRA's production approval testing. The hard part, the part that takes months, was done. What the receiving sites in those threads needed was a front door to it. So we built one.
What changes on 1 October 2026
From 1 October 2026, permitted receiving sites in England and Wales must record every waste movement arriving at their gate with DEFRA's Digital Waste Tracking Service, and they must do it within two working days of the waste arriving. Scotland follows on 1 January 2027. This is not a yearly return or a quarterly summary. It is a report for every single load, every time, in DEFRA's exact digital format.
DEFRA does offer a free spreadsheet route, and we would encourage any site considering it to look at it closely before relying on it. The template is two linked tabs that must be matched by a reference you add yourself, the data must follow strict formats down to the way a hazard code is written, and once you submit a spreadsheet you start a new one, so it never becomes a running log. DEFRA itself describes the spreadsheet as transitional. It exists so nobody is locked out at go live, not as a long term way to run a busy weighbridge. We wrote about the wider deadline in our guide to the October 2026 rules.
What WasteLinks does for your site
The idea is simple: the data a load arrives with should only be handled once. You log the load in WasteLinks, and we build the record in DEFRA's exact format and submit it through our connection, which has passed DEFRA's production approval testing. Every code is picked from DEFRA's own lists rather than typed, so the formatting traps that catch people out on the spreadsheet simply cannot happen. Waste codes, container types, hazard properties and carrier details all go in the right shape the first time.
There are two ways to log a load, and you choose whichever suits the moment. The first is a form designed for speed: pick the waste code, enter the weight, confirm the carrier, done in under a minute for a routine load. The second is for when the paperwork is already in your hand. Photograph the transfer note or consignment note that arrived with the lorry, and WasteLinks reads it and fills the form for you. You then check what was read, correct anything it was unsure about, and press one button that says exactly what it does: check and submit. Nothing ever goes to DEFRA without a person at your site confirming it first, because you remain the legal author of your own records. The same photograph and confirm flow works from the browser on your phone today, and it is built into the WasteLinks app that is on its way to the App Store.
Hazardous waste is covered properly, not as an afterthought. Consignment note codes, hazard properties and the reasons DEFRA accepts when a document did not travel with the waste are all part of the form, and the rules between them are enforced as you type rather than bounced back by the regulator later.
The two working day clock, watched for you
Every load you log gets its own deadline, calculated from the moment the waste arrived and skipping weekends, exactly as the rules do. Your dashboard shows the clock on every unsubmitted record, turning amber as the deadline approaches and red if it passes, so the question of whether your site is up to date has an answer you can see at a glance. If something needs correcting after submission, you amend the record and WasteLinks sends the correction to DEFRA against the same tracking reference. Every submission and every response is kept in an audit trail you can export.
Verified like our carriers, priced for real yards
When a site registers, we run the same checks our carriers go through. Your company is verified live against Companies House, and your permit is checked against the Environment Agency public register where the register can confirm it. Where it cannot, for instance an older licence reference, we review it by hand rather than pretending a computer checked it.
The price is one flat number: £39 per month per site, with hazardous included, no commission and no contract, and you can cancel any time. Sites that join before 1 October 2026 pay nothing until the rules take effect, which means you can get your team comfortable with the system while the pressure is off. The full detail is on our pricing page.
Frequently Asked Questions
Does WasteLinks handle hazardous waste receipts?
Yes, fully. Hazardous loads carry their consignment note code, hazard property codes and component details, and the form enforces DEFRA's rules between them as you type. Where paperwork genuinely did not travel with the waste, the reasons DEFRA accepts are built in.
What is the DEFRA Digital Waste Tracking ID and how do I get one?
DEFRA issues an ID to every receiving organisation that registers with the Digital Waste Tracking Service. Registering with DEFRA is a legal duty for permitted sites and takes a few minutes on GOV.UK. When you add your site in WasteLinks we show you exactly where to go and where to paste the ID, and from then on every submission is made on your site's behalf.
My permit was issued in Wales or Scotland. Can I still use WasteLinks?
Yes. The automatic permit check covers the Environment Agency register for England, so permits from other regulators are simply reviewed by a person instead of a machine. The reporting itself works the same way, and Scottish sites come into scope on 1 January 2027.
What happens if I make a mistake in a submitted record?
You open the record, correct it and submit the amendment. WasteLinks sends the correction to DEFRA against the same waste tracking reference, and both versions stay in your audit trail.
Do I need the mobile app to photograph paperwork?
No. The photograph and confirm flow works from the browser on any phone today. The WasteLinks app includes the same flow with a faster camera experience and is on its way to the App Store.
Ready to get the spreadsheet off your October to do list? Register your site and be set up well before the deadline.
Ready to get started with WasteLinks?
Find verified waste carriers or list your services today.